CDG

Famous industrial control product manufacturer

Image name
Image name

Download

Image name
Image name

Video

Image name
Image name

Contact

Heshan Power Plant, Guangxi

    Guangxi Heshan Power Plant was founded in 1967, and was constructed in five phases. From March 1971 to October 1986, eight units were put into operation, with an original installed capacity of 505MW (i.e., units 1-3: 3 x 25MW, units 4-5: 2 x 65MW, units 6-8: 3 x 100MW). Since 1993, the plant has upgraded units 4, 5, 6, and 7, increasing the total capacity to 525MW. On July 30, 1992, it was designated as a large-scale enterprise by the state. With the adjustment of national energy policy, units 1-3 were decommissioned in December 2000 and completely dismantled in 2001. The site and existing resources were used to expand and reconstruct the 2 x 330MW unit project. The current generating capacity (including increased capacity) is 470MW. Due to aging equipment, the power plant renovation project, after careful selection, finally chose from numerous brands American CDG as the supplier for this project's electric butterfly valves company With the efforts of our technical engineers and partners, the project was successfully completed, The installation and operation of the electric butterfly valves were problem-free, The customer was very satisfied and highly recognized the CDG brand.