CDG

Famous industrial control product manufacturer

Image name
Image name

Download

Image name
Image name

Video

Image name
Image name

Contact

Zhejiang Energy Zhenhai Power Plant

The original Zhenhai Power Plant project was a key construction project during the Sixth Five-Year Plan and the Seventh Five-Year Plan periods, approved by the State Planning Commission and the Ministry of Water Resources and Electric Power. The entire project broke ground in March 1977, with the first 125MW unit put into operation at the end of 1978. By June 1990, all six steam turbine generator units were completed and put into operation, equipped with 2 x 125MW oil-fired units and 4 x 200MW coal-fired units, with a total installed capacity of 1050MW. It was the first million-level large-scale port in Zhejiang Province thermal power plant and also a major power plant in the East China Power Grid, belonging to a national large-scale enterprise. Power plant renovation project, After careful selection, finally selected from many brands to cooperate with the United States CDG Cooperation! The United States split pneumatic actuator won customer recognition with its outstanding performance!